VMWARE MIGRATION SOLUTION

Migrate VMware
to Hyper-V with Confidence

VMware Costs Rising? Partner Options Shrinking? You Have a Path Forward.

Broadcom’s VMware changes have created real disruption for small and mid-sized IT teams: fewer purchasing channels, more restrictive partner programs, and pricing models that can raise the minimum cost of staying on VMware.

Schedule Your Free Migration Assessment →

✓ 30-minute consultation • ✓ No obligation • ✓ Instant booking

Migration Success Rate

100%

Avg. Downtime

<2 hrs

Cost Reduction

40-60%

🔒

SOC 2 Certified

Enterprise Security Standards

🛡️

Zero Data Loss

Guaranteed Migration Safety

99.9% Uptime

SLA Guaranteed

🏆

25+ Years

Industry Experience

4.9/5 Rating

200+ Reviews

Why Hyper-V for SMB and Mid-Market IT

Hyper-V is a proven virtualization platform that fits the realities of SMB operations

Cost Control

Predictable Microsoft licensing strategies, often aligning with Windows Server investments you already have

Simplified Management

Streamlined operations for Windows-centric shops with familiar tools and interfaces

Strong Integration

Seamless integration with backup, DR, monitoring, and Microsoft ecosystem tooling

Practical Off-Ramp

A reliable exit strategy when VMware renewals become unpredictable or cost-prohibitive

What Xaccel Delivers

Comprehensive migration services designed for minimal risk and maximum uptime

01

VMware → Hyper-V Migration, Done Safely

We plan and execute migrations that minimize downtime and preserve business continuity:

02

Hyper-V Host & Cluster Buildout

Whether you’re refreshing hardware or repurposing existing gear, we can:

03

Backup, DR, and Operational Readiness

A migration isn’t “done” until you can recover:

04

Optional: Hybrid & Cloud Adjacencies

If it makes sense, we can design for:

Our Migration Approach

A proven, staged methodology that minimizes risk at every step

1

Assess

Fast, focused assessment: what you have, what matters, what can’t break

2

Design

Target design: Hyper-V architecture aligned to uptime and budget

3

Pilot

Pilot migration: prove the process with representative workloads

4

Migrate

Wave migration: controlled cutovers with rollback plans

5

Validate

Validation: performance + backup + recovery testing

6

Optimize

Optimization: cleanup, tuning, documentation, and handoff

What You Get

📋

Clear Migration Plan

A staged migration plan with no surprises or hidden costs

🔓

Reduced Lock-In

Reduced licensing and vendor lock-in pressure

Supportable Environment

A supportable Hyper-V environment your team can run confidently

📚

Usable Documentation

Documentation you can actually use for ongoing operations

Ready to Escape VMware Lock-In?

If VMware renewals, reseller access, or licensing minimums are forcing uncomfortable decisions, Xaccel can help you evaluate options and execute a clean migration to Hyper-V.

Next Step: Free Discovery Session

A short discovery session to review your cluster size, critical workloads, renewal timelines, and the quickest low-risk migration path.

⚡ Only 3 Slots Left This Week  ✓ No obligation   ✓ Instant booking